Lies of P, the most recent action-adventure RPG in the Souls-like genre by Neowiz Games, offers a remarkably diverse selection of weapons that you'll undoubtedly want to experiment with. Some of these weapons are essential, as they are indispensable for effectively tackling specific encounters that would otherwise prove exceedingly challenging.
Every weapon in the game comprises two components: a blade and a handle, and you have the freedom to pair any blade with any handle according to your preferences. At times, you may require a light and extended weapon, allowing you to attach a dagger blade to a spear's handle, for instance. The possibilities are truly endless.
It's worth mentioning that you can have standard and special weapons, where the special ones are fixed and cannot be altered like the common ones.
Numerous weapons can be acquired through vendors, while others await discovery as you explore the game world. This guide compiles a comprehensive list of all the weapons available for purchase and discovery in the game. So without further ado, let's get started.
Lies of P weapons
Puppet's Saber, Wintry Rapier, and Greatsword of Fate
Depending on the class you select at the beginning of the game (of which there are three options), your main weapon will vary from Puppet's Saber for balanced class, Wintry Rapier for light class, and Greatsword of Fate for heavy class. However, in our experience, no matter which weapon you choose, when appropriately upgraded, it undoubtedly ranks among the finest choices. It's worth noting that you can buy all three of them at any time during the game when you fast travel back to the Cerasani Alley and interact with the merchant there.
Electric Coil Stick
By default, this mace weapon possesses an innate shock status, and although its raw power may be limited, this attribute grants it a significant advantage in shock-based attacks.
You can purchase the Electric Coil Stick for 1,200 Ergo from a vendor located inside a house near the stargazer in Elysion Boulevard.
Krat Police Baton
Use the fast travel option to reach the "Inside the House on Elysion Boulevard" stargazer. Continue to the location where the Weeping Woman side quest unfolds. Within this area, you'll encounter a mini-boss on patrol. Eliminate this mini-boss, and you'll receive a Krat Police Baton as loot.
Booster Glaive
You can locate this massive and exceptionally potent weapon within a chest located in the area patrolled by the Puppet of the Future boss. Acquiring this weapon doesn't require engaging in combat with the boss; instead, climb down the ladder and head to the left side of the arena. Left of the sewer opening, you'll discover a chest containing this weapon. Exercise caution to avoid dying to the corruption in this arena, unless you've already cleared it during the Puppet of the Future boss encounter.
Salamander Dagger
You can find this weapon near the initial stargazer within the Factory level, specifically in the Workshop Union Entrance area. Starting from the stargazer, ascend the stairs on the right and enter the first room to your left. Behind the stacked boxes, there's a hatch that leads to the room below. Proceed inside and eliminate the two white puppets in the room. In this location, you will discover a safe housing a Salamander Dagger.
Fire Axe
The Fire Axe can also be found in the Factory level. Use fast travel to reach the Venigni Works Union Cuvert stargazer, then ascend the small flight of stairs. Proceed through the tunnel, where you'll encounter a passage with a massive rolling fireball. Navigate to the right along the tunnel, carefully avoiding the fireball and any lurking puppets. At the tunnel's end, you'll discover a chest containing a Fire Axe.
Big Pipe Wrench
Following your victory over King's Flame, Fuoco boss, proceed through the newly unlocked passage until you arrive in a moderately spacious area teeming with numerous enemies, including two distinctive individuals hurling shock bombs your way. The chest containing this weapon can be found close to these two bomb-throwers. Begin by ascending the ladder located near the first bomb-thrower; eliminate them, then proceed up the next ladder. On the platform where the second bomb-thrower is positioned, you'll discover a chest containing the weapon.
Acidic Crystal Spear
Commencing on the Path of the Pilgrim stargazer, advance along the path until you encounter an enemy positioned before a blazing barrel. Go to the right, and at the end of this path, you'll find a chest containing the Acidic Crystal Spear. Exercise caution as you navigate the route, as it's populated by mechanical hounds and animal traps.
Bone-Cutting Sawblade
Upon reaching the Malum District area and speaking with the two characters encountered in the factory, continue until they cease accompanying you. Enter the next building and descend via ladder or by dropping down. Upon exiting this room, you'll enter the mini-boss arena. Deal with or stealthily bypass the mini-boss, proceed into the hallway on the opposite side of the water-filled courtyard, and climb the ladder. Exercise caution due to the presence of acid-throwing enemies. The weapon can be found behind the leftmost of these enemies, concealed within a chest.
Bramble Curved Sword
The vendor located inside the Red Lobster inn in the Malum District area offers this weapon for sale. To access the vendor, you need to open the door positioned close to the stargazer from within the inn. The vendor's location is on the upper floor of the inn.
Seven-Coil Spring Sword (Special Weapon)
This sword can be purchased from Alidoro for one Parade Leader's Ergo, the special material you get after beating the Parade Leader boss. If you don't know where Alidoro is, follow out guide.
Etiquette (Special Weapon)
This dagger can be purchased from Alidoro for one Broken Hero's Ergo, the special material you get after beating the Broken Hero boss.
Holly Sword of the Ark (Special Weapon)
This sword can be purchased from Alidoro for one King's Flame Ergo, the special material you get after beating the King's Flame, Fuoco boss.
Trident of the Covenant (Special Weapon)
This blunt weapon can be purchased from Alidoro for one Twisted Angel's Ergo, the special material you get after beating the Fallen Archbishop Andreus boss.
Dancer's Curved Sword
Return down the stairs from the Rosa Isabelle Culvert Stargazer and head right past the broken carriage. Continue forward, and on your right will be a gate you can open. Behind the puppet guards there is a chest, and the Dancer's Curved Sword lies within.
Exploding Pickaxe
After You enter the Estella Opera House, go up the stairs and choose the left staircase. Exit through the door and continue right down the hall. There will be a lot of puppets in this hallway, along with the big, spider-looking one. The big one will follow you if you choose to run away. At the end of the hallway downstairs, you will encounter a mini-boss. Fight him or evade him; it's up to you. Just know that the safe containing Exploding Pickaxe is in the room this mini-boss emerged from. When you pick up the weapon, exit the room and continue to the right, then up the stairs to the left. Open the shortcut here; it will come in handy for the upcoming boss fight.
Clock Sword
After defeating Romeo, King of Puppets boss, continue walking down the street, dispatching puppets along the way, until you reach the first ladder located on the right side of the street. Climb the ladder and kill three puppets. Behind the third puppet, the one that was sitting, is a chest with Clock Sword inside.
Puppet Ripper (Special Weapon)
This weapon can be purchased from Alidoro. After you beat Romeo, King of Puppets, return to Alidoro and exchange the Burnt-White King's Ergo for the Puppet Ripper.
Tyrant Murderer's Dagger
Can be bought from Pulcinella, but not before you find Venigni's stollen box to expand his shop's collection. This box is located in a safe in the lower levels of Estella Opera House. Make sure to check every room here because this area can be very complicated to traverse and you can easily get lost in the hallways. There are also two mini-bosses roaming those hallways, so be very careful.
Once you locate the box, bring it back to Pulcinella, and from his inventory, you will be able to purchase the Tyrant Murderer's Dagger, among other useful stuff.
Circular Electric Chainsaw
This weapon can be bought from a black market vendor in Lorenzini Arcade. This vendor is located in a room near the Stargazer, but to be able to get to him, you must unlock the shortcut to Arcade Underground, which will require killing some dangerous enemies.
Frozen Feast (Special Weapon)
Can be exchanged for the special Ergo obtained from the Champion Victor boss. However, Alidoro, the merchant you buy special weapons from, cannot be found at Hotel Krat after beating Champion Victor. To find it, go and speak with Eugenie, and she will set you on a side quest to bring Alidoro a certain four-fingered glove. Alidoro can be found in the Barren Swamp area, and you can buy the sword from him there. However, if you are collecting weapons after the main story, Alidoro will be inside the hotel in the usual place.
Live Puppet's Axe
After you speak with Alidoro, continue forward until you reach the bigger area with a corruption river and a lot of puppets, along with one puppet shooting rockets at you. The chest that contains this weapon is located next to the rocket-shooting puppet. To reach it, run inside the silos and climb the ladder to the top.
City Longspear
From the Barren Swamp Ravine stargazer, look up, and you will notice a ladder that needs to be activated in order to create a shortcut to the Stargazer here. After you activate this shortcut, go towards the house on the cliff, and when you reach it, a puppet will run through a closed door. Inside this house is a chest containing this weapon.
Two Dragons Sword
This is a special weapon that can be obtained from Alidoro after you beat the Puppet-Devouring Green Monster boss for one Puppet-Devouring Green Hunter's Ergo. After beating the boss, talk to Alidoro, and he will suggest that you return to the hotel to meet him there. Do that, and obtain this weapon from him.
Master Chef's Knife
This weapon can be found in a chest near the Krat Central Station stargazer. When you unlock the closest gate to the Stargazer, descend the ladder and proceed forward. You will notice one carcass sitting near some boxes. Attack him and clear the four other carcasses that will appear. The chest is located behind the boxes in this room.
Military Shovel
This weapon can be bought from the Wandering Merchant inside the house where Collapsed Street Stargazer is located. This Stargazer is located within Krat Central Station, but only when you visit it for the second time. It counts as the ninth level of the game.
Cursed Knight's Halbert
Cursed Knight's Halbert can be obtained from the chest prior to the second encounter with the Black Rabbit Brothers boss, or more precisely, inside the Relic of Trismegistus area. Head down the stairs until you reach the area where the mini-boss jumps on you through the wall. Fight him or avoid him; it's your call. On the half-broken bridge here, you will find the chest containing the weapon.
Keep in mind that this list is not final, as we will add every new weapon we discover along our playthrough.
DON'T MISS!















































